KROGER WAREHOUSE | BLUE ASH, OHIO
This project consisted of a 41,000 square feet freezer addition, 2 guard houses, a truck wash building, 7 riser rooms, intense interior concrete restoration & 22,000 square feet of concrete site work.
UC CENTRAL SERVICES BUILDING ADDITION | CINCINNATI, OHIO
Project consists of demo and retrofit of pile caps built in the 1930’s, grade beam, 27’ high architectural walls and slab on grade.
ODOT FULL SERVICE MAINTENANCE FACILITY | GEORGETOWN, OHIO
Project consisted of foundations, walls and slabs for 5 buildings Material Storage, Salt Storage, Cold Storage, Truck Storage, Office-Maintenance plus 10,000 sf concrete sitework.
CLERMONT COUNTY CANCER CENTER – LINEAR ACCELERATOR | BATAVIA, OHIO
New 9,000 SF cancer-treatment facility with Digital Linear Accelerator Technology. Project included mass concrete foundations, walls and structural concrete decks to provide required radiation shielding.
HORSESHOE CASINO – SMOKERS OUTDOOR GAMING AND SMOKERS LOUNGE | CINCINNATI, OHIO
New 10,000 SF outdoor gaming and smoking facility. Driven H piles support concrete pile caps, grade beams, structural slab on grade, foundation walls and slab on metal deck.
DUKE ENERGY | MONROE, OHIO
21,000 SF new office complex for Duke Energy, 580 LF retaining wall, 12,000 SF concrete sitework, 70 tons of rebar reinforcing 1,900 CY of concrete.
CYRUSONE 9MW DATA CENTER UPGRADE | LEBANON, OHIO
Completed heavy-equipment foundations, pads, screen walls, and 30,000 SF of paving for this data-center expansion—placing 3,000 CY of concrete on a fast-tracked schedule. Delivered on time and on budget.
HARRISON JUNIOR SCHOOL | HARRISON, OHIO
Turnkey concrete work for this 142,000 SF new school, including 20,000 SF of sitework and 3,500 CY of concrete placed.
CROSBY ELEMENTARY SCHOOL | HARRISON, OHIO
Concrete foundations and 17,000 SF of sitework for a new 70,000 SF grade school serving 800+ K–5 students. Over 2,000 CY of concrete placed.
GRAPHITE | CINCINNATI, OHIO
Five-building multifamily development with concrete frame and podium construction, 207,000 SF of slabs, and 5,400 CY of concrete placed.
UDF UNITED DAIRY FARMERS | CINCINNATI, OH
Turnkey concrete scope for this new 6,000 SF store, including 22,500 SF of sitework. Our team placed 900 cubic yards of concrete, delivering a durable, high-quality foundation and exterior surfaces on schedule.
SES – SELHORST EQUIPMENT SERVICES | MIAMITOWN, OH
Concrete foundations, Walls and slabs for a 32,000 SF New office/warehouse for SES, with over 1,000 CY of concrete placed.
RIVERS CROSSING CHURCH | MASON, OHIO
Completed a new entry and site upgrade for the church, including 45,000 SF of decorative site concrete. Over 1,000 cubic yards of concrete were placed to create an impressive and durable entryway for the congregation.
PARAMOUNT LAUNCH | CINCINNATI, OHIO
This project included a concrete frame and podium for a multifamily residential overbuild. The 2’ thick podium is supported by 20’ concrete columns and foundations. With 1,500 CY of concrete placed across 20,000 SF, the project demanded precise engineering and execution to ensure structural integrity and long-lasting performance.